The innovative approach that allows for this cost efficiency is MMC. According to Dixon, "The Quad homes at Hadston have been built by Dunelm Castle Homes in configurations of four homes using modern methods of construction whereby a timber frame and structural insulated panel system, both manufactured off-site in factory conditions to ensure total quality control, is then assembled on-site to provide a contemporary open plan ground-floor layout to match modern living aspirations" (25).
This is not to say, of course, that site-built residential and commercial structures are obsolete or will be anytime soon; however, it is to say that modern methods of construction provide a viable and cost-effective alternative to traditional construction methods. In this regard, Dixon advises, "As a company, we will always be building homes in traditional methods, but we are also now in the forefront of the new modern methods of construction which use new technology and new ways of construction to produce high quality homes, usually faster and often cheaper than their traditional counterparts" (25). Also termed "industrialised building," MMC is based on the principle that as much of the work as possible is transferred from the site to the factory leaving only a simple assembly operation to be carried out on site" (Non-traditional housing in the UK -- a brief review 2002, 7).
Three MMC Options
Based on the foregoing, three viable options for the two-dwelling structure using MMC techniques are provided in Table 1 below.
Table 1
Three options for two-dwelling structure using MMC techniques
Option
Description
Closed construction
With closed construction the bulk of the structure is...
Chapman (2001) equated the dangers explained within the Central Computer and Telecommunications Agency Publication "Management of Project Risk" into the design threats that included however were not restricted to "trouble in catching and pointing out the individual requirements," "problem of approximating the time and resources needed to finish the design," "trouble of gauging development throughout the advancement of the design." Chapman likewise specified that the design group's thorough expertise
Soft Systems Techniques in the Preparation of Information Technology as a Systems Manager Company Systems Consulting process and model Systems approach, client relationships Company Culture Client defenses, attachments to existing systems Interaction with the company culture in order to facilitate change System and Culture working together Dependancy issues Lewin Company Systems Consulting process and model Systems approach, client relationships Company Culture Client defenses, attachments to existing systems Interaction with the company culture in order to facilitate change System and Culture working together Dependency issues Lewin's model of
5.4: Accept Bullring team accepted some risks; however, the company developed the effective cost and schedule strategies to manage these risks. For example, the company allotted sufficient fund to militate against risks associated with the project costs and schedule. Table 2 presents the compressive list all the risks deemed to affect the outcome of the Bullring project. Table 2: Associated Risks on the Project Cost Related Risks: Index Scores Tight project schedule 0.67 Design variations 0.49 Project variations from